game

How good are you at scheduling? Play now!

How good are you at scheduling

Try your skills with this interactive game, simulating the scheduling of bicycle production in a factory. Are you ready?

You will have to:

  • Select your character and manufacturing environment
  • Understand the manufacturing operations required for production
  • Place operations in order across production resources
  • Consider machine and staff availability
  • Schedule operations to meet your delivery date

Discover how critical APS software is in meeting the challenges of planning and scheduling

Evaluate your skills with this interactive game and try to schedule a bicycle production in a factory.

Explore the difficulty to manage manually higher data volume in a discrete manufacturing environment in the context of production scheduling. Discover how Advanced Planning & Scheduling can assist you in this process to release feasible and optimized schedule to your production facilities!

Please note this game has been designed to run on PC and is optimized for full-screen mode.

Share

Related resources

Streamline bid and tender management while enabling continuous energy project compliance
Webinar

Streamline bid and tender management while enabling continuous energy project compliance

Watch for our webinar to learn about using Polarion to streamline your bid and tendering processes while ensuring regulatory compliance throughout the project lifecycle.

Safety Lifecycle Evaluation Part 2: The Data is Compelling
Blog Post

Safety Lifecycle Evaluation Part 2: The Data is Compelling

Introduction This post builds upon the first post titled Key findings of a safety critical lifecycle evaluation. Simply put, productivity…

Polarion connector for IBM Rhapsody 2503
Blog Post

Polarion connector for IBM Rhapsody 2503

We are excited to present our latest release, the Polarion Connector for IBM Rhapsody 2503. In this update, we've added…