How a premier defense provider cut engineering change cycles from over 12 months to just days
A single change in aircraft loads used to take Northrop Grumman more than 12 months to work through, with every requirement retraced, every downstream impact reassessed and every team realigned before the program could move forward. The company rebuilt how change moves through its programs, and requirements, designs and decisions now live in one connected digital engineering ecosystem powered by Siemens, traceable from concept through sustainment. Watch the video to see how they did it.