Designing floating platforms for offshore wind turbines comes with intense complexity—from unpredictable waves and wind forces to mooring line loads. Current analysis methods couldn’t keep up, slowing development and limiting early-stage optimization.
As presented in this case study, Front Energies used Simcenter simulation software to achieve faster and more accurate virtual testing of platform designs, early in the development cycle.
Download the case study to discover how embracing simulation enabled Front Energy to achieve: