Although digitization is important for vehicle development, it is vital to collect the in-field road loads on physical prototypes to develop reliable vehicles. For this, durability testing is key. However, there is increasing pressure to reduce physical durability testing time. A typical durability testing campaign
goes through various steps, from instrumentation and test preparation to the physical measurement to validation. This process alone can take roughly 21 days depending on the test, and that's not including any potential test re-runs.
This white paper describes how you can take in-field data acquisition to the next level by
increasing the effectiveness of every step in the measurement process, including instrumentation and test preparation, taking measurements, validating and postprocessing the data. Read more to learn how by using Simcenter SCADAS RS hardware you can boosting testing efficiency by up to 50 percent.