Infographic

Continuous, digital handover for plant and facility information

Reading time: 2 minutes
Operator analyzing data on tablet

Handover of asset information from contractor to owner operator (OO) often occurs at the end of a project and as a single “data dump” of documents. This leaves the plant and facility OOs with a pile of data and documents to sort through. The process of validating this information and the manual work associated is very costly. Some studies have shown that up to 98% of OOs experience delays due to poorly filed operational information, while 88% of OOs incur unexpected costs due to information problems following handover. In this infographic, we further define the issues faced by owner operators, describe keys to successful information handover, and outline the benefits of Siemens’ handover solutions.


Share

Related resources

Simcenter 3D: The Latest
Blog Post

Simcenter 3D: The Latest

Simcenter 3D: the latest, is regularly updated blog that keeps you up to date with the latest news on Simcenter 3D and related mechanical solutions.

Simcenter 3D for structural simulation
E-book

Simcenter 3D for structural simulation

Simcenter 3D for structural simulation offers a set of finite element (FE) structural solvers. Download this solution guide to learn how Simcenter 3D can help you efficiently evaluate the structural performance of your products.

Speeding up finite element analysis to accelerate iterations and explore more design configurations
Case Study

Speeding up finite element analysis to accelerate iterations and explore more design configurations

GKN Fokker uses Simcenter 3D to cut model creation time from weeks to days and improve optimization of aircraft structures