SIMARIS design - basic handling | Session 3

Webinar | 15 September 2026 | 19:00 PET (UTC-5) | Language: Spanish

19:00 Perú-Colombia-Ecuador / 18:00 Mexico / 20:00 Chile / 21:00 Argentina

SIMARIS project provides a quick overview of the space requirements inside the building for your power distribution system, from the medium-voltage level to the distribution board for electrical installations. You can thus quickly determine the budget and automatically create a technical specification as well as BIM (building information modeling) data. In this training, you will be able to handle the tool on your own and work with it.

Content:

  • MV SWG configuration - primary AIS and GIS
  • MV SWG configuration - secondary AIS and GIS
  • MV/LV transformer configuration
  • Main LV SWG configuration
  • LV motor control center (MCC) configuration

Prerequisites: None
Duration: 2 hours
Cost: Free of charge

A Siemens software interface on a monitor, displaying a "front view" of electrical panel layouts and settings.

Speaker

Michael Arias.

Michael Antonio Arias Huamani

Technical Consultant | Expert in power distribution planning at Siemens Totally Integrated Power

Two colleagues discuss a project on a laptop, with a holographic building blueprint projected behind them on a dark blue wall.

This webinar is brought to you by Totally Integrated Power. Shaping the future of electrical planning in real and digital worlds – that is our approach. Through project support, SIMARIS planning tools and BIM, technical documents and trainings, our holistic solutions deliver reliable and sustainable results for the future of power distribution.